Kingsport Raw Water Intake Facility

Kingsport Raw Water Intake Facility

This project includes the construction of a new Raw Water Pumping Station in Kingsport, Tennessee and a nearly 1,100 foot long tunnel to connect the new pump station to the South Fork of the Holston River. 

Tigar International Project

Tigar International Project

A new construction project for Tigar International to include ample warehouse space for product distribution and adequate office space.

Tenneco Automotive Warehouse Addition

Tenneco Automotive Warehouse Addition

The design-build warehouse addition at Tenneco Automotive in Smithville, TN created additional space for storage of new automotive parts manufactured at the facility, a new dock area for shipping products, and access to the new facilities.

TTU Jobe/Murphy Residence Hall Upgrade

TTU Jobe/Murphy Residence Hall Upgrade

The Jobe/Murphy Residence Hall Upgrade was a complete renovation of two dorm facilities on the campus of Tennessee Technological University. 

Sparta Waste Water Pumping Stations

Sparta Waste Water Pumping Stations

A new submersible sewage pump station located on the same sites as the existing Mayberry Street lift station, South Carter Street lift station, and Turn Table Road lift station.

Doctors Boyd Medical Facility

Doctors Boyd Medical Facility

This new construction of an Optometry office for Drs. Zach & Lori Boyd focuses on offering more room for patients before, during, and after their examinations.

Bullington Repair Shop

Bullington Repair Shop

This automotive, semi-truck and RV repair shop includes a showroom and display area for RV sales, maintenance area with multiple bays and office space.

Church on the Hill

Church on the Hill

This expansion included additional classrooms, bathrooms and storage, a new coffee bar and gathering area – all built with future growth in mind.

Gallatin Water Treatment Plant

Gallatin Water Treatment Plant

This addition includes a new Sodium Hypochlorite Feed Building and a 5,500 square foot stand-alone structure with a major focus on the subsurface conditions.

Waverly Waste Water Treatment Plant

Waverly Waste Water Treatment Plant

This project included the installation of a new headworks structure and influent pump station.  The main challenge of this project was the dewatering need for construction.