This project included the installation of a new headworks structure and influent pump station.  The main challenge of this project was the dewatering need for construction.  As the water table is about 3 feet below the existing grade and the excavation in the sandy soil was over 20’ deep, the dewatering was integral to project completion.

Project Specs:

  • Location: Waverly, TN
  • Completion Date: July 2015