This project generally consists of two additional treatment trains increasing the plant capacity by 1.6 MGD (total capacity 3.868 MGD) including flash mix, flocculation, sedimentation basins, gravity filters, new tri-plex transfer pump station rated at 1,500 gpm @ 52 feet TDH (2,900 gpm with two pumps operating) and all related appurtenances.

Major Activities:

  • Construction of New Sedimentation Basins,

  • Filter Building and Transfer Pump Station

PROJECT INFORMATION:

  • Location: Lafayette, TN

  • Date Completed (Estimated): January 2027

  • Contract Value of $6.2M

  • Owner: City of Lafayette – USDA / Rural Development

  • Engineer: Evan White, Mid-Tenn Engineering Co.