This project was the addition of a new Sodium Hypochlorite Feed Building and other related items. The concrete and masonry structure was a 5,500 square foot stand-alone structure behind the existing plant. The major challenge on this project was the rock subsurface conditions.

Project Specs:

  • Location:  Gallatin, TN
  • Completion Date:  Anticipated – December 2015