This addition includes a new Sodium Hypochlorite Feed Building and a 5,500 square foot stand-alone structure with a major focus on the subsurface conditions.
Projects
Viewing entries in
Water & Waste
This addition includes a new Sodium Hypochlorite Feed Building and a 5,500 square foot stand-alone structure with a major focus on the subsurface conditions.
This project included the installation of a new headworks structure and influent pump station. The main challenge of this project was the dewatering need for construction.
This project involved new influent headworks, influent pump station, SDADA, metering system, disinfection structures, chemical feed systems, and a maintenance building.
This construction included a new oxidation ditch, flow equalization and RAS pump stations, chlorine analyzer, laboratory building, sludge bed modifications and more.