Adams Field Water Reclamation Facilities Parallel Treatment

Adams Field Water Reclamation Facilities Parallel Treatment

Expansion of the city of Little Rock, Arkansas’ water treatment facility. New construction includes a MegaDisk pile cloth media filtration building, new clarifier and additional upgrades to existing components of the treatment facility.

Project Specs:

  • Location: Little Rock, AR

  • Completion Date: anticipated August 2020

Tupelo Raw Water Supply Facilties- Contract A: Intake/Pumping

Tupelo Raw Water Supply Facilties- Contract A: Intake/Pumping

Construction of a raw water pump station for the city of Tupelo, Mississippi. This includes new construction of eight pumps, pilings, and a floating barge and piling protection for the submerged intake in the Tennessee-Tombigee Water Canal.

Project Specs:

  • Location: Fulton, MS

  • Completion Date: anticipated October 2020

Moccasin Bend Solids Optimization- Phase 2

Moccasin Bend Solids Optimization- Phase 2

Equipment, concrete, painting, and other miscellaneous repairs to sludge thickeners 1 through 5. New pumps, piping, valves, roofing, masonry, doors, weir gates, HVAC, electrical SCADA/Instrumentation and odor control units for pump stations 1 and 2. Primary and secondary sludge feed line 3-way valve replacement and demolition of the existing 3-way sludge valve and manholes and replacing with two new vaults each with two new motorized plug valve and a sump pump.

White County Athletic Complex

White County Athletic Complex

A new athletic complex for the White County Schools. This complex includes new baseball & softball fields, soccer field, football practice field and a concession stand with bathrooms. It is intended to be used for all levels of White County athletics.

North West Utility District- Water Treatment Facility Improvements

North West Utility District- Water Treatment Facility Improvements

Construction of a new PALL Membrane Unit Water Treatment Plant Facility. This project also entails refurbishment of existing water treatment plant facilities sedimentation basins and chemical feed equipment.

 

Project Specs:

  • Location: Soddy Daisy, TN

  • Completion Date: anticipated December 2019

New Mt. Denson Pumping Station

New Mt. Denson Pumping Station

Construction of a new water distribution booster pumper station and upgrades to the existing SCADA system.

  • Location: Springfield, TN

  • Completion Date: February 2018

Kingston Springs Sewer Plant Upgrades

Kingston Springs Sewer Plant Upgrades

Upgrade of the existing sewer plant consisting of a new waste water lagoon and new chlorine contact basin with step aerator

  • Location: Kingston Springs, TN

  • Completion Date: Anticipated- September 2019

Adamsville Waste Water Treatment Plant Improvements

Adamsville Waste Water Treatment Plant Improvements

New Clear-well & filter building with horizontal pressure filters that includes new potassium and chlorine chemical system, SCADA, HVAC and offsite RTU communication.

  • Location: Adamsville, TN

  • Completion Date: March 2018

Sparta Waste Water Treatment Plant Improvements

Sparta Waste Water Treatment Plant Improvements

Construction of a new Clear-well & modifications to the filter building with horizontal pressure filters that includes new potassium and chlorine chemical system, SCADA, HVAC and offsite RTU communication.

  • Location: Sparta, TN

  • Completion Date: July 2018

Citico Pump Reliability Improvements

Citico Pump Reliability Improvements

Construction of a new emergency backup pump station and upgrades to the existing SCADA system as well as any other existing plant and pump station modifications

  • Location: Chattanooga, TN

  • Completion Date: Anticipated- November 2018

Portland Wastewater Treatment Plant Improvements- Phase 1

Portland Wastewater Treatment Plant Improvements- Phase 1

This is the first phase of the plant improvements at Portland, TN that will include removal of an existing mechanical step screen and compactor and grit classifier and installation of new ones. It will also include new construction of pump station and bubble diffuser system to existing sludge holding basin

  • Location: Portland, TN

  • Completion Date: August 2019

Heraeus Plant Expansion

Heraeus Plant Expansion

 30,000 SF expansion to the Heraeus Metal Management Processing Plant in Wartburg, TN.