This Water Treatment Plant Improvements project consists of a new sodium hypochlorite building and sodium hypochlorite system used to treat water prior to distribution to residents of Rutherford County, TN.
Projects
Viewing entries in
Water & Waste
This Water Treatment Plant Improvements project consists of a new sodium hypochlorite building and sodium hypochlorite system used to treat water prior to distribution to residents of Rutherford County, TN.
A new submersible sewage pump station located on the same sites as the existing Mayberry Street lift station, South Carter Street lift station, and Turn Table Road lift station.
This addition includes a new Sodium Hypochlorite Feed Building and a 5,500 square foot stand-alone structure with a major focus on the subsurface conditions.
This project included the installation of a new headworks structure and influent pump station. The main challenge of this project was the dewatering need for construction.
This project involved new influent headworks, influent pump station, SDADA, metering system, disinfection structures, chemical feed systems, and a maintenance building.
This construction included a new oxidation ditch, flow equalization and RAS pump stations, chlorine analyzer, laboratory building, sludge bed modifications and more.